Customization: | Available |
---|---|
Application: | Power, Lighting |
Phase: | Three |
Still deciding? Get samples of US$ 2458/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Custom 200 250 300 315 350 400 500 600 630 700 750 800 kVA 10kv 11kv 0.4kv Three Phase 3 Stepdown Electric Oil Immersed Power Distribution Transformer for sale
Number of Phase | Three Phase |
Winding Type | Two Winding |
Rated Capacity | 200kVA |
High Voltage | 10/11kV |
Low Voltage | 0.4kV |
Tapping Range | ±2x2.5% |
Impedance Voltage | 4% |
Load Loss | 2.73/2.6kW |
No-load Loss | 0.34kW |
No-load Current | 1.0% |
Frequency | 50/60Hz |
Connection Group | Yyn0/Dyn11 |
Cooling Method | ONAN |
Coil Material | Aluminum/Copper |
Size | 1240x780x1360mm |
Weight | 910kg |
Mainly Components:
The mainly parts of this transformer include Oil Tank, Conservator, Buchholz Relay, Breather Unit, Oil Indicator, Temperature Detector, Pressure Relief Device, Thermal Relay, Radiator, and Bushing.
1. The oil tank is used to soak the windings by placing it in.
2. Comply with IEC standards with CE/ISO certificates
3. be easily contacted & enlarge throughout loading so that the temperature of the oil can be increased and decrease.
4. Buchholz relay is used when a conservator tank is used. Because it indicates errors like loss of oil once it goes low, improper flow of oil between the tank & transformer.
5. Breather Unit includes silica gel that absorbs moisture in the oil. It changes its color from blue color to pink color it is not capable to absorb moisture in the oil.
6. The oil indicator indicates the level of the oil within the conservatory unit.
7. The temperature detector monitors the temperature of the oil. If the temperature of the oil increases to a certain level then the transformer will be disconnected from the service.
8. Pressure relief device decreases the pressure within the transformer to avoid an explosion of the transformer.
9. Thermal relay is used as an indicator for the temperature of the winding
10. Full galvanized coating no rust
11. The bushing is used to connect the internal windings of the transformer with the help of an exterior electrical network.
Waste incineration project,three gorges dam project,zhuhai-hong kong-macao bridge,state grid corporation,coal mine,photovoltaic project Power stations,compact transformer station, normal industrial factories , mines , hospitals, buildings, airports, tunnels, chemical plants, nuclear power plants etc.and so on.
TSTY Electric Co., Ltd. was established in 2011 and is an excellent and reliable transformer manufacturer in China. The company mainly develops and produces oil-immersed transformers, dry-type transformers, box-type substations and high and low voltage complete sets of equipment.
The equipment put into production and operation of the project advocates energy saving, intelligence, information and mechanization. The company has established the Henan Triangle Energy-saving Transformer Engineering Technology Research Center,with 71 utility model patents and 15 invention patents.
With years of accumulation in the transformer industry and strong technological innovation capabilities, TSTY Products are sold to the Middle East, North America, South America, Europe, Southeast Asia, Africa and other regions, covering more than 40 countries.